Office of Facilities Development

Projects Requiring Designers

If you are interested in a project listed below:

  1. Visit the website of the Office of State Architect to review the updated Designer Selection Process.
  2. Register with the Office of State Architect.
  3. Download and save the April 2013 revision of the Designer Letter of Interest Form.
  4. Complete the document specifically for the project in which you have interest.
  5. The response is limited to four pages (do not include photographs or attachments).
  6. Attach the completed Letter of Interest (in PDF format) to the appropriate email link in the list below.
  7. TBR requires a Designer Letter of Interest for Standard and Minor projects.


Last Updated on 12-12-2014

CampusProjectMACCAddedDueE-Mail
Nashville SCCSoutheast Center Roof Replacement
Replace roof, related components and repair the roof drainage system for the Southeast campus (former Dillards store). Specific expertise with roofing systems is required and is a part of basic services. Designer to provide forensic investigation of roof and all components. The duration of design will be a consideration in the selection of the designer due to a planned renovation of the upper floor. Along with qualifications, submit your proposed design schedule.
1,760,00012-01-201412-22-2014Submit